Christmas came early!

It was with great anticipation and delight I directed the big semi up our long driveway to where we would unload the new MultiCam. While I chased down and printed out the necessary papers to send off the old router the driver unchained and untarped the load. The machine was shrink wrapped in white plastic as I knew it would be. I quickly checked for physical damage and then signaled the unload to begin.
The rotary attachment was the first to come off the truck. It was squeezed into the router room doorway – a test for the big piece to come.
Next off was the HEAVY DUTY ROUTER. Weighing in at 4,000 plus pounds we were a bit worried the heavy rains of the last few days would give us trouble in the gravel drive. Our fears proved unfounded. The machine barely squeezed through the narrow drive up the back however, with mere inches to spare on each side. We slid one end into the doorway and then using floor jacks on one end and the forklift on the other we snaked it into the workshop. 
The new vacuum was the last piece to go in. Everything fit perfectly. The gantry still needs to be put into place and everything has to be bolted together and dialed in. Now we wait for the tech to come set it up for us.

The old machine was then loaded on the truck, chained into place and tarped securely for the drive back to Texas. I only missed it for a minute as I admired the shiny new replacement.
Now, the new adventure begins. Stay tuned…
-dan

Published with permission from precisionboard.blogspot.com. Source.