Monday morning started out with a bang. A new hire, Annie, started this morning. When I arrived at the Fox & Hounds Pub she was waiting and eager to start. Our task was to install the routed mantle on the fireplace and finish framing the upper portion of the fireplace feature. There was lots of figuring to be done, coordination with the electrician and other trades. We would be working inside the pub which was operating. We were the entertainment for the day.
Annie knew the tools well and had done carpentry work before, but never anything quite like this. Nothing was straight and we worked without levels or straight edges. Everything was built by eye. She caught on quickly. While I built one side she would follow along on the other, matching my creations. 
The curves were gentle enough that I didn’t need to use the heating pad to bend the Precision Board. I had milled the pieces to be 1/2 – 3/4″ thick at most and so they took the bends without breaking. We used PB Bond-240 and it held securely in no time. I’ll be using the die grinder to tidy up the corners and match the woodgrain as it transitions from the front to the top and bottom. The curved mantle absolutely works with the curved roof above. the wall of the upper fireplace bows out about 6″ and the mantle is almost 14″ deep. The london roofline above is now almost tied into the bottom portion. and it WORKS!
We were almost done before the electrician turned on the power to the lights and there was instant magic. In the next days we’ll staple on the diamond lath and then start in on the carved concrete ‘brick work’. By next week it should be looking like the magical fireplace I designed, what now seems like ages ago.
The guests love the family crest and are curious as to the translation of the latin phrase on the front. We happily translated it for them when they asked. The crest is suspended about four inches off the back face of the sunken circle and throws a marvelous shadow while it catches the light in a spectacular fashion. It will look even better when it is painted up and then aged appropriately. I can hardly wait to see it all done!
It was a fun day with lots of progress. 
-dan

Published with permission from precisionboard.blogspot.com. Source.

Production in spite of me

Yesterday was one of those days when almost nothing went right. Tools broke and had to be replaced, pieces were missing and had to be fabricated, and I simply got things wrong. Not much headway was made through the day in the shop. We all have days like that from time to time. At least the weather was perfect for those drives to town. I tried my best to whistle while I worked.
The good news however was in the router room the router kept chugging away doing things right. The file was massive, the detail was tight and the file ran a long time but it ran flawlessly. While I was frustrated in the shop and running back and forth to town the machine kept working, and working and working. It worked through the night while I caught up on my sleep. This morning when I came out to the shop it was done, perfectly. I had no worries. This is what I love about my MultiCam. Even the tools were put back in their holders. It doesn’t get better than that.
The file was one I created in EnRoute last week. Since I posted the mantle project here I changed things up a little and added a few more pieces for the bottom and top of the mantle. It now covered a full 4×8′ sheet of 1″ thick 30 lb Precision Board, wasting little material. Tomorrow we’ll glue the pieces into place and then build the rest of the new fireplace front around it. 
Stay tuned for pictures of the progress…
-dan

Published with permission from precisionboard.blogspot.com. Source.

Key piece installed

Today I had my heart set on finishing the outside concrete work. But when we arrived at the site the plasterers had staked out the territory for their work. I wasn’t about to work under them. So we instead worked on the archway we had started last week. I showed how I built the routing file for the keystone with the letter ‘D’.
The concrete work is started at the top, with new concrete gingerly hung from the previously applied mud. It takes practice to lay on a heavy coat of wet concrete without a whole bunch hitting the floor from time to time. It took about two hours to lay on the Mud. It was Hailey’s first time mixing and she did a great job! We had time for some delicious pub food before we began the carving process. We started on the top on the oldest concrete. laying out the lines for the brickwork freehand and then carving in the grooves. Like all the other brickwork we had done it flowed in sweeping lines instead of being deadly straight as is most traditional brickwork. Carving is a slower process than applying the concrete – especially once the chemical reaction kicks. With the warm temperatures of today it was a race against time to get it done. At the end both Hailey and Sarah were helping me to carve in the details. 
I’ll still do a little detail work on the keystone, filling in the seam lines and mounting screw holes and evening out the texture with the die grinder. Then we’ll apply some base coats of paint. But before the glazes go on it is time to work some more sculpting magic. Two or three knarly grape vines will wind their way around the old worn bricks, looking like they have grown there for many decades. These will be sculpted over a welded steel armature to make them plenty strong. Then we’ll paint the vines and glaze and age everything so it looks as old as the pub we are crafting. All of it is working hard to tell our story.
-dan

Published with permission from precisionboard.blogspot.com. Source.

Counter inlay and other progress

Progress continues on many fronts at the Fox & Hounds pub. Because so many people are working in a small space we have to be very flexible, often working on three or four areas in a single day. Today was one of those days. Things are getting completed however.
A number of weeks ago I used EnRoute to create files of a simplified logo. This file was taken to my MultiCam dealer and he kindly used the MultiCam water jet cutter to cut the pieces from stainless steel and brass. I gave the pieces to the fellow who was casting the concrete countertops for the new bar. Yesterday they arrived at the pub at last and look fabulous! The logo is about 24″ tall and appears in two places on the bar. It adds a very classy detail to the project!
The temporary floor came down revealing the London rooftop for the pub patrons. It is giving everyone a first glimpse of what is to come in the other parts we have been working on. 
I’ll be posting some new pictures soon that will show the many other areas of progress around the pub. It is all coming together quickly now.
-dan

Published with permission from precisionboard.blogspot.com. Source.

Mantle routing file

Yesterday the temporary floor which we worked on to build the ‘London roofline’ came down. I could then size up exactly how I would build the new fireplace facade. After looking things over I decided I would use a wood frame for the bulk of the construction and welded steel for the bits around the fireplace opening. All will be covered with a layer of sculpted concrete. I fastened a piece of plywood to the center portion of the fireplace and hung the family crest as a point of reference. Everything would be scaled to this. Then I framed in the mantle using 3/4″ plywood. I will glue the routed 30 lb Precision Board over this form.
I then used the wooden mantle form to create a 1/4″ plywood pattern in two halves. It is just a hair under 11 feet wide. I took a picture of this pattern to create the vectors I needed by simply tracing it out. My client requested ‘genuine’ Old English lettering for the pub name.
I did the Lettering in Illustrator but it could have been done in EnRoute. I then brought the vectors into EnRoute to begin creating the reliefs. Since my board (and router) are only eight feet long I needed to break the file into sections to route. I drew a box and brought the bottom corners in to the angle of the bend.  I also did an 0.7″outline of the mantle shape to enlarge the mantle front enough to put a 1/2″ top and bottom piece of Precision Board on the mantle. I’ll carve those in place with the die grinder. I deleted the original smaller mantle shape and used the jigsaw tool to create the three pieces of the mantle front.
The text was then centered on the mantle.
I created the three flat reliefs at 0.4″ height. The I imported the horizontal sandblasted wood grain bitmap from my TEXTURE MAGIC collection. It stretched out to 12 feet without difficulty. I also stretched it out vertically to fit the mantle in a section of grain I liked. It was applied with a value of 0.2″
The lettering has a 0.3″ border. I first created a relief using this border vector. This was merged highest with the mantle pieces. Lastly the bevelled lettering is added to the relief.
 The tool pathing was done with a 3/8″ ball nose bit for the rough pass and a 1/8″ ball nose bit for the final.
I’ll route the pieces in the next days, and then install next week.