Fetch Sign Install

The old sign is down.  It took about an hour and a half to get our steel bracket system installed and everything went together nicely.  Best of luck Adam with your new sign – See you at Fetch! – Steve

001 006 015 016

Published with permission from KDF Custom Graphics. Source.

Fetch Sign – Woof 6 (the final Woof)

It’s our last day with the Fetch Sign – we are finishing up the details and doing the final assembly. All the parts are painted so Peter now has to complete the pins and glue all of the elements in place – I’ll do a little welding and we should be done.

270272

280

 

273 274 281 293 294We really want to make the collar ring look as real as possible so we shaped a 4′ length of  steel rod inserted into the hole in the dog tag and welded a plate on it so we could easily secure it to the structure.  We ran a bolt through the top of the sign to hold it in place.

296

300

Here she is – Ready to hang!

302

It’s time for dinner. Hmm where should I go…..

-Steve

 

Published with permission from KDF Custom Graphics. Source.

Fetch Sign – Woof 5

All the parts are completed and they’re off to our paint shop. We use a PPG Waterborne Automotive Paint System which gets great results and is much less harmful to the environment.

Holin, our master painter,  has prepped the metal parts in our bead blaster, he then cleans them with a metal prep and  they are ready for primer and paint.

IMG_3980

 

IMG_3979 The foam parts are lightly sanded and we brush on a thick HDU primer. Two coats of the primer then paint.

IMG_3983

IMG_3982

IMG_3981

 

 

Published with permission from KDF Custom Graphics. Source.

Fetch Sign – Woof 4

Today we are fabricating the interior frame of our sign. We are using 1″ Square steel tubing.

We’ve pocket a raceway into the back of each sign panel.  Peter is setting the steel pieces in place, we’ll tack weld them inside the sign for a perfect fit then take it out and complete our welds.

IMG_3903

Untitled-2Here it is all welded up and ready for assembly.

IMG_3907

 

 

Published with permission from KDF Custom Graphics. Source.

Fetch Sign – Woof 3

Now it’s time to cut the elements that make up the face of the sign.

126The first element is the 3D bone which will have the Fetch name contour pocketed about an 1/8″ into the surface. Our rendering shows the layout and depth of the lettering.

147

The bone is also carved out of 2″ HDU.

149

152

We’ll then inset painted aluminum letters into that pocket for a real nice effect. This will allow us to easily have a different paint finishes on the bone and the letters.

We are cutting the “tag” face out of .063 aluminum.  The text will then be cut out of the aluminum – when glued in place we’ll see the background color of the sign panel come through.

142 143 145

And here it is! almost done – next is onto the welding of the frame and mounting system.

312

 

 

 

 

Published with permission from KDF Custom Graphics. Source.