Bailey’s Project: Day 7 – part 1

OK Its Friday – we are installing on Sunday – St. Patrick’s Day is Monday. Hmm. Pressure is on!!!!!!

Brian has been in the paint shop for days – not sure if he’s seen daylight.  But it’s payin’ off! After all the priming Brian started mixing the paints and spraying. Time is running out but we’re almost there. We have a crew out today installing the bracket on the building so Sunday we can focus on transporting and hanging this 200lb baby.

The colors are amazing and the finish is incredible. We 3D cut the face of the ribbons and left the accent lines of the font on the ribbon.  This way it would create a dramatic depth when the letters get placed in. Brian hand painted the gold details and the filigree.

IMG_3430 IMG_3435

The main body of the sign is painted and its time to attach the front face pieces and the grill.  IMG_3434

The LED’s are inserted and it comes alive!

IMG_3440

Published with permission from KDF Custom Graphics. Source.

Completed KDF Studio Sign

Our special custom studio sign project is all done!  we have our new sign and dragon mascot (no name yet though). This was a fun one.  Everyone loves it, but I think it’s giving Mark nightmares.  Now all of our after hours attention will be focused on the mechanical fish project

Excerpt from:
Completed KDF Studio Sign

Halo Lit Custom Channel Letter Sign

Our friends at Crestron Electronics hired us to create a front desk lobby sign for their headquarters.  We’ll be creating custom channel letters with high gloss black finish mounted to a satin metal box and lit with LEDs.  The challenge with this sign was that the box was about 110″ long and our cutting bed was only 96″

More:
Halo Lit Custom Channel Letter Sign