Today, being Saturday was sort of a day off. Janis was busy with horse stuff and so I had the time to do what I wanted in the shop. It has to be fun! And what could be more fun than doing the last of the painting on the balloon and then hanging it in it’s permanent home in the studio.
I dragged my tallest step ladder in from outside then drilled some holes in the vaulted ceiling and securely fastened in the strong aircraft cables I had bought for the occasion. Then it was time to ‘fly’ the balloon into position. This balloon was definitely heavier than air! It didn’t take long to secure everything perfectly. A few touchups made it all ready for the photo shoot.
The first four axis routing project is now officially done!
-dan
Published with permission from precisionboard.blogspot.com. Source.