This past week Peter and I flew out to Oshawa, Ontario to visit NEB’s Fun World. After almost a year in design and construction the bulk of the pieces we built and transported there have been installed. The NEB’s crew did a fabulous job! Our task was to do a few touchups, install some of the signs and do the texturing and faux finishing on the upper portions of the side walls. 
The pieces had never been previously fitted together s our shop is simply not nearly large enough. The sheer scale of the project is amazing. Our panels, fit together, covered more than four hundred feet of wall! 
As we worked I thought back to the first concept drawings done of the project. The first drawing is one done by Peter as we started to work out he logistics. It is of the left corner.
The picture below is of a similar angle and it is amazing how close we came as we designed. Once the ceiling panels are ct and installed it will look even more like the concept.
A second drawing which I did a little later worked out more of the details for presentation. A few things changed as we proceeded. The archways had to be flattened out a little to keep things legal for the serious bowlers. We were still working on the colors at this point as well.

Since our client had his own CNC router it didn’t make sense to do all the pieces in British Columbia and then transport them across Canada. We simply provided the cutting files and he took it from there for the grass, tree and mountain silhouettes.


Despite the pieces being loaded, transported more than 4,000 kilometres, unloaded, and lifted into place they were in almost perfect shape. We created more than a hundred pieces in all and they fit together almost perfectly. We did only a little caulking to fill a couple small gaps. Two days of on site painting finished our work.

The NEB’s crew was still lifting the last of the posts into position as we worked and has yet to cut and install the ceiling flats but it is coming together quickly. The tough part of the job is that they did it without shutting down more than a few lanes at a time. While they worked guests were still bowling around them. Below i

s a panorama shot showing the immense nature of the job.

There is more to come as well. Special lighting is being tested and will be installed across the entire back wall. The owners will be able to create special lighting effects and shows which will be spectacular!

We now head back to our studio to begin design for the e=next phases of the project. This is going to be fun!