It is pure magic as we install the scores of features at Skallywag Bay in Trinidad. It’s been four years since we started building the fourteen shipping containers full of features. We packed the last of them into the containers more than two years ago. Now at last it is time to install everything. Today was the day to assemble two of the attraction signs. Being too tall to fit out of the shop door we built and shipped them in sections. Today was the first time we’ve seen them put together. They are every bit as we imagined they would be and will look even better when he gardens are planted!
Every piece lifted beautifully which was amazing as we could only estimate where the lift points needed to be as we fabricated the pieces. Everything fit together perfectly as well… a testament to our team’s engineering and fabrication skills.
Some of the pieces we fabricated were shipped as parts for final assemblies. These logo skull brackets were plasma cut from 1/2″ thick steel plate for each side of the posts in the train station and entrance building.They looked great welded into place!
Stay tuned for more pictures tomorrow!
Published with permission from precisionboard.blogspot.com. Source.