The carpenters are now finished the soffits of the new house, meaning we can start in on our work in a big way. The backing for the trim pieces was first put in place and then the fiberglass reinforced concrete was troweled on. Rock work was sculpted into the bottom
Richard’s plumbing
Our in floor heating contractor decided he too wanted a sign our front of our house.
Fox and Hounds sign install
The morning dawned bright and clear- perfect for a delivery. I checked the straps on the load, made sure the lights were working on the trailer and we were off! We pulled into the parking lot just as John backed into place with the crane
Fox sign ready for transport
After waiting almost twelve weeks for a permit to install the Fox and Hounds Pub sign it is at last time to do the install. Todays task was to first build a giant easel on the flat bed trailer. We used welded steel for maximum strength.
Curved ceiling framework
The vaulted ceiling pieces I cut a few days ago fit perfectly. They strengthened and tied tougher the top of the ceiling joists where they attached to the ridge beam and also gently wrapped the curved ceiling over the top of the room
CNC house
The MultiCam has been busy in the last few days routing the many pieces we needed to create the vaulted ceilings in the upstairs bonus rooms, and the living/dining room. As the machine cut the pieces effortlessly it brought back memories of many hours cutting similar pieces by hand back in the days before we got the CNC router.
Time for more cutting
The framing of the house is coming along quickly. A common theme that goes through the house both inside and out is arches
Firs trim installed
The new house is coming along great! The roof sheeting is a couple of days from completion. While the carpenters were busy on the roof we were busy on the ground floor welding up the framework for the trees and then attaching the lath for the plasterwork to follow. At long last we are now ready to begin icing the cake