Blogs

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Josh Lange and Precision Board

Josh Lange and Precision Board: At the heart of Lange Customz's success lies Precision Board from Coastal Enterprises. Lange seamlessly integrates Precision Board into his company's products and services, leveraging its versatility and precision. Unlike other products...

The Bald Eagle

In the world of signage and branding, one company stands out for its exceptional craftsmanship, creative designs, and impeccable attention to detail – Lacombe Signmasters. With a legacy spanning over three decades, this family-owned business has garnered a reputation...

A Shoe To Remember

In downtown Minneapolis, there is a vibrant local theater called Roxy’s Cabaret with a giant red stiletto on the roof. Their logo uses two red high-heeled shoes to make the “X” in Roxy, so they were interested in some eye-catching shoe signage to go along with it. And...

Art Deco Gable End

Art Deco Gable End | March 29, 2023Sculptor and carver Jayce Fox used Precision Board to create this beautiful decorative piece that fits within the gable end of a client’s home. “The Art Deco format was inspired by the time period the home was built [1915]. The...

Another Guest Blog from Paul at Art Sign Works

Guest Blog from Paul at Art Sign Works | February 24, 2023Art Sign Works Inc., founded in 2005, has been making 3-D bas-relief plaques from Precision Board since 2009. Previously, our team utilized HDU from two U.S. manufacturers but we determined that Precision Board...

Textured Wall for Corporate Display Using Precision Board HDU

Textured Wall for Corporate Display Using Precision Board HDUWhen Adam Campos of Graphics MFG was first contacted by a design agency about creating a textured wall for a corporate artwork display, there was a lot of skepticism about whether or not it could be done....
When Steampunk meets Polynesian

When Steampunk meets Polynesian

The past few months I have been learning new things pretty much daily and the past few weeks I have been tasked on learning the machines on the vinyl side of the business. As the illustrator/designer at the shop I am often given challenges or tasked to come up with ideas frequently. Jim loves to give me the most curve ball concepts to work with.

read more

One more day

All the Viking ship armatures  are now welded. Every piece (23 per ship) has been sent off to the galvanizers to get its shine coat of zinc. So far we only have enough back to build one and a half halves of the ship.

read more

Ship shaped

Yesterday and today were busy days as the crew worked hard to sculpt the skin of half of the first Viking ship hull. Those many weeks of preparation made the sculpting process straightforward. The hull now looks bigger than ever! The second half of the hull will be ready for sculpting early next week – about the same time we’ll begin the painting of the first half.

read more

Heads or tails?

With the cutting, fitting and welding on the Viking ships now behind us we can concentrate on the sculpting at last. Today that work began on the first Viking ship beginning with the head and tail of the keel and the shields which hang on the side of the ship’s hull. Things went well and we begin the actual hull of the ship tomorrow. While the crew sculpted I spent the day with our client on the next project

read more

Last weld on Viking ship structure!

Just before quitting time today we did the last weld on the second Viking ship. It’s been nine weeks of cutting, fitting, welding and grinding to get the structures of this project done. There’s still little bits of welding on the dragon keel for the front plus some stands and pallets for shipping but that won’t take long. We still have to send the rest of the pieces to the galvanizer but one half of the first ship is now ready for sculpting and the rest won’t be far behind

read more